From flat pack.
To workspace.

The EROUnits system is built around efficient transport and straightforward on-site assembly. Follow the process from the first component to the finished office.

Four steps.
One finished workspace.

The installation sequence in our wholesale catalog, shown with photos from the site.

  1. Unloading prefabricated EROUnits components from a shipping container
    01 / UNPACK

    Unpack & organize.

    Receive and organize the prefabricated components.

  2. EROUnits base positioned at the assembly site
    02 / POSITION

    Position the base.

    Set the base on a suitable prepared and level surface.

  3. Wall panels being lifted into place on an EROUnits office
    03 / ASSEMBLY

    Bring it together.

    Install framing, insulated panels, roof, windows and doors.

  4. Completed EROUnits mobile office on site
    04 / COMPLETE

    Prepare for use.

    Finish final site requirements and prepare the office for use.

See how it comes together.

Watch the assembly process, on site.

The film starts muted. Use the player to turn sound on.

Watch on YouTube

Packed for
efficient transport.

Vertical flat-pack loading helps make more use of each 40' high-cube container. The catalog lists these model capacities.

View logistics in the catalog
Units per 40' HC container
ModelFootprintUnits
ERO 1313' × 8'10
ERO 2020' × 8'10
ERO 4040' × 8'5

Capacity depends on model and loading configuration.

Let’s talk about your setup.

Ask about assembly